Jobs List for Tonight

Sorry about the late posting, but I’ve been away.

Plank 6 is now on, so we can take our pre-made external stem sections off the shelf, dry-fit them and mark them for shaping, also assembly the two strips that will form the external keel, mark them up and glue them together.

There’s also a lot of general cleaning up of glue drips and lots more sanding to be done.

This entry was posted in Job lists. Bookmark the permalink.

Leave a Reply